← All runs

BE99 DEV test sandbox · Live run · Thu, 29 Oct 2026, 10:45 pm AEST

Pronto 2.0 Test Results

Each check creates a real job in the Pronto test sandbox, runs it through the Obzervr integration the way a site would, and reads the result back from both systems.

Checks run
1
Working
1
Problems found
0
Needs a look
0
Not set up yet
0
Test jobs created
1

What this run tells us

1 of 1 checks passed. No check found a known problem in the integration.

  • 1 working
  • 32 not run this time

Every check, by area

Show

Jobs coming from Pronto into Obzervr

1 of 7 working
What we checkResultWhat happened
A planned job raised in Pronto appears in Obzervr with all its detailsPWO-P2O-01WorkingAll steps passed.Pronto job 026374
Labour requirements come across, including changes and deletionsLAB-01Not run this timeNot selected for this run.
Each work type (PM, breakdown, corrective and BE99's extra types) comes acrossPWO-P2O-02Not run this timeNot selected for this run.
Bulk status and date changes in Pronto update ObzervrPWO-P2O-03Not run this timeNot selected for this run.
Plant items with several monitor points come acrossPWO-P2O-04Not run this timeNot selected for this run.
Pronto keeps a link back to the Obzervr jobPWO-P2O-07Not run this timeNot selected for this run.
Quick links on a Pronto job show in ObzervrQL-01Not run this timeNot selected for this run.

Completing jobs back to Pronto

0 of 11 working
What we checkResultWhat happened
Completing a planned (PM) job updates Pronto: notes, times and hoursPWO-O2P-01Not run this timeLeft out by live-safe mode, because it completes, finalises or cancels a job.
A break-in job raised in Obzervr is created in Pronto with every fieldBWO-01Not run this timeNot selected for this run.
Different kinds of timesheet entry on a break-in job reach ProntoBWO-02Not run this timeNot selected for this run.
Finishing one section of a job sends it to Pronto straight away, onceGIC-01Not run this timeNot selected for this run.
Materials on a job are kept in step between Pronto and ObzervrMAT-01Not run this timeNot selected for this run.
Completing a planned (PM) job updates Pronto: notes, times and hoursPWO-O2P-01Not run this timeNot selected for this run.
Completing a breakdown job updates ProntoPWO-O2P-02Not run this timeNot selected for this run.
Completing a corrective job updates ProntoPWO-O2P-03Not run this timeNot selected for this run.
When Pronto refuses to finalise a job, the refusal is handled cleanlyPWO-O2P-05Not run this timeNot selected for this run.
Fault codes, downtime and finish date reach Pronto on completionPWO-O2P-06Not run this timeNot selected for this run.
A job Pronto has already finished isn't changed by a later cancelPWO-O2P-09Not run this timeNot selected for this run.

Cancelling and putting jobs on hold

0 of 6 working
What we checkResultWhat happened
Cancelling a job in Obzervr cancels it in ProntoWOSC-01Not run this timeLeft out by live-safe mode, because it completes, finalises or cancels a job.
Cancelling a job in Obzervr cancels it in ProntoWOSC-01Not run this timeNot selected for this run.
Putting a job on hold with a coded reason puts it on hold in ProntoWOSC-02Not run this timeNot selected for this run.
Putting a job on hold with an 'Other' free-text reasonWOSC-03Not run this timeNot selected for this run.
A coded hold reason that needs a comment carries the comment to ProntoWOSC-04Not run this timeNot selected for this run.
Cancelling after a job is finalised leaves the Pronto job finishedWOSC-05Not run this timeNot selected for this run.

Work requests

0 of 4 working
What we checkResultWhat happened
A work request raised inside a job carries every field to ProntoWR-01Not run this timeNot selected for this run.
A standalone work request reaches ProntoWR-02Not run this timeNot selected for this run.
A work request raised inside a planned job reaches ProntoWR-03Not run this timeNot selected for this run.
A work request with a blank Requested By doesn't fail or loopWR-04Not run this timeNot selected for this run.

Stock, readings and master data

0 of 5 working
What we checkResultWhat happened
Master data record counts match between Pronto and ObzervrMDS-COUNT-RECONCILENot run this timeNot selected for this run.
New monitor points in Pronto are created in ObzervrMP-01Not run this timeNot selected for this run.
Monitor point readings: update, correct and deleteMP-02Not run this timeNot selected for this run.
Plant readings taken in Obzervr reach ProntoPWO-O2P-04Not run this timeNot selected for this run.
A stock order raised in Obzervr reaches ProntoSO-01Not run this timeNot selected for this run.

How much of the UAT workbook this covers

The customer's UAT workbook has 221 rows that BAs test by hand before a release. This is where each row stands after this run.

  • 11 checked automatically and passed
  • 111 automated, but not run this time
  • 65 still needs a person to check
  • 21 can't be automated (emails, pdfs, tablet)
  • 13 dropped from uat on purpose

How to read the results

Working

The integration did what it should, checked in both Pronto and Obzervr.

Problem found

The integration did something wrong. It has a Jira ticket.

Needs a look

The check didn't pass and the team hasn't said why yet, or it hit a test or sandbox issue.

Not set up yet

The sandbox is missing a setting the check needs, so it didn't run.